Kashagan Growth Projects
- Home
- portfolio
- SUBSOIL USE
- Kashagan Growth Projects

| Clients: | RP GAZ LLP |
| Url Link: | RP GAZ LLP |
| Date: | 2024-2026 2025-2031 |
| Status: | DONE |
Kashagan Growth Projects
Key indicators
The Kashagan field is recognized as the largest oil discovery in the past four decades and stands out as one of the most complex industrial projects globally. Its development is particularly challenging due to several factors, including high levels of hydrogen sulfide, harsh environmental conditions at sea, and significant engineering, logistics, and security challenges.
Currently, the full-scale development of the Kashagan field is being implemented in stages. Phase 1 of the project is already in production, showcasing initial successes and laying the groundwork for future expansions.
Looking ahead, Phase 2 is being planned as part of three separate projects, with the most advanced studies focusing on Phase 2A and Phase 2B. These phases are strategically designed to enhance oil and condensate production levels significantly over the next decade, aiming to increase the overall output of this critical asset.
The Kashagan field’s development not only contributes significantly to Kazakhstan’s economy but also exemplifies cutting-edge technology and innovation in overcoming the unique challenges presented by such a demanding environment.
Project “Stage 2A”
The Stage 2A project aims to significantly boost oil production at the Kashagan field to approximately 500,000 barrels per day (kbbl/d) (around 63,000 tons per day). This increase will be achieved by supplying an additional 2 billion cubic meters (bcm) of sour gas per year to a third-party gas processing plant. Currently, efforts are focused on defining the project’s concept, which includes assessing the technical and operational requirements to facilitate this enhancement in production.
Project “Stage 2B”
The Stage 2B project seeks to further elevate oil production levels to about 710,000 barrels per day (kbbl/d) (approximately 89,500 tons per day). This ambitious initiative will involve the development of new sections of the Kashagan field and the construction of new facilities, along with an increased supply of sour gas amounting to 6 billion cubic meters (bcm) per year to a third-party facility. Similar to Stage 2A, work is currently underway to define the concept, ensuring that all aspects of production optimization, infrastructure development, and environmental considerations are thoroughly addressed.
Together, these projects represent a significant step forward in maximizing the potential of the Kashagan field while contributing to Kazakhstan’s energy goals. They underscore the commitment to advancing production capabilities while managing the complexities associated with operating in such a challenging environment.
Related Projects
Introduction of Computer Simulator Systems (CSCs) at the Refineries of the Republic of Kazakhstan
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2019-2024 Status: DONE Introduction of Computer Simulator Systems (CSCs) at the Refineries of the Republic of Kazakhstan Improving the quality of personnel work in regular and emergencies situations, increasing the reliability of installations, and preventing unscheduled shutdowns. LocationPavlodar, Атырау, ShymkentTerms of implementation2019-2024ParticipantsPOCR, Atyrau Refinery, PKOP, KPICurrent statusIn […]
View details
Creation of a digital master plan and 3D model of the refineries of the Republic of Kazakhstan
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2020-2021 Status: DONE Creation of a digital master plan and 3D model of the refineries of the Republic of Kazakhstan The project includes the creation of a high-precision digital refinery master plan as the basis for the «digital twin» of the enterprise. LocationPavlodar, АтырауTerms of implementation2020-2021ParticipantsPOCR, Atyrau […]
View details
Introduction of engineering models at the refineries of the Republic of Kazakhstan
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2020-2023 Status: DONE Introduction of engineering models at the refineries of the Republic of Kazakhstan Creation of engineering models of for primary and secondary oil refining units LocationPavlodar, АтырауTerms of implementation2020-2023ParticipantsRP GAZ LLP’s, POCR, ATYRAU REFINERYCurrent statusIn implementation Follow us: Goals of the project: Creation of a […]
View details
Introduction of information security system (Cybershield)
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2020-2022 Status: DONE Introduction of information security system (Cybershield) Connection of KMG group to the industry Operational Information Security Center of QazCloud LLP (OISC) which prevents, detects, analyses, and responds to cyber threats. LocationAstana, Атырау, Aktau, PavlodarTerms of implementation2020-2022ParticipantsRP GAZ LLP’s, OMG, EMG, Atyrau Refinery, POCR, KTO, […]
View details
Introduction of a project management system in KMG (PMS)
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2019-2022 Status: DONE Introduction of a project management system in KMG (PMS) Improving the quality of project implementation in the KMG group using the Stage Gate Process by ensuring the transparency of project activities, exclusion of unprofitable projects, redistributing the powers of the investment bodies, qualitative study […]
View details
Introduction of the «Bank of Ideas» platform
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2015-2022 Status: DONE Introduction of the «Bank of Ideas» platform Creation of a transparent process for the implementation of rationalization ideas of the employees to increase motivation and develop a culture of continuous improvement. LocationPavlodar, Атырау, ShymkentTerms of implementation2015-2022ParticipantsPNHZ, ANPZ, PKOPGeneral ContractorKMG Kumkol LLPCurrent statusIn implementation Follow […]
View details
Introduction of Lean 6 Sigma program in the Oil and Gas Production business line
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2021-2024 Status: DONE Introduction of Lean 6 Sigma program in the Oil and Gas Production business line Training and certification of the employees of KMG group’s extractive enterprises in project management and forming a culture of continuous operational improvement of the production processes. LocationAktau, Атырау, KyzylordaTerms of […]
View details
Abai Project
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: — Status: DONE Abai Project Centralization of all production information of the KMG group in a single database on the Big Data platform, as well as its processing and analysis using artificial intelligence and machine learning. LocationMangystau region, Atyrau region, Aktobe region, Kyzylorda regionTerms of implementation ParticipantsNC KazMunayGas […]
View details
Improving operational efficiency at Ozenmunaigas JSC (RLG)
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2021-2022 Status: DONE Improving operational efficiency at Ozenmunaigas JSC (RLG) Optimizing selection of the best wells and operating costs, implementing best practices, training of active workers to replicate the transformation model LocationMangystau regionTerms of implementation2021-2022ParticipantsOMGCurrent statusIn implementation Follow us: RP GAZ LLP will achieve improvements in production […]
View details
Polyethylene Project
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2022-2027 Status: DONE Polyethylene Project LocationAtyrau regionTerms of implementation2022-2027ParticipantsNC KazMunayGas JSC (29.9%), SIBUR PJSC (30%), Sinopec (30%), KMG PetroChem LLP (10.1%)Current statusStrategic partners Sibur (Russia) and Sinopec (China) have been engaged in the Project and the Project is in the active design stage Follow us: Key indicators […]
View details
Construction of a gas chemical complex in the Atyrau region
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2008-2022 Status: DONE Construction of a gas chemical complex in the Atyrau region LocationАтырауTerms of implementation2008-2022ParticipantsSamruk-Kazyna Ondeu LLP (49.5%), NC KazMunayGas JSC (49.5%), Almeks Plus Firm LLP (1%)General ContractorChina National Chemical Engineering Co. (CNCEC, China)Current statusOn 8 November 2022, the plant was launched. As of today, all […]
View details
Winter Diesel Production
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2020-2025 Status: DONE Winter Diesel Production LocationPavlodarTerms of implementation2020-2025ParticipantsPavlodar Oil-Chemistry Refinery LLP (100%)Current statusAn EPC contractor has been engaged. Engineering works are in progress Follow us: Key indicators winter diesel fuel, thousand tons annually 0 investments, billion tenge 0 new jobs during the construction period 0 new […]
View details
The First Stage of the Reversal of the Kenkiyak-Atyrau Oil Pipeline Section with a Capacity of up to 6 Million Tons Annually
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2018-2022 Status: DONE The First Stage of the Reversal of the Kenkiyak-Atyrau Oil Pipeline Section with a Capacity of up to 6 Million Tons Annually LocationAtyrau region, Aktobe regionTerms of implementation2018-2022ParticipantsMunaiTas LLP (51% – KazTransOil JSC, 49% – CNPC Exploration and Development Company Ltd.)General ContractorGAZ Stroy Montazh […]
View details
Karachaganak Production Rate Maintenance Projects
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2018-2026 Status: DONE Karachaganak Production Rate Maintenance Projects LocationWest Kazakhstan regionTerms of implementation2018-2026ParticipantsKazMunayGas (10%), Eni (29.25%), Shell (29.25%), Chevron (18%), Lukoil (13.5%).Current statusIn implementation Follow us: Key indicators maintenance of liquid hydrocarbon production plateau, million tons annually 0 investment, billion US dollars 0 new jobs during the […]
View details
Marine geological exploration projects
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: Status: DONE Marine geological exploration projects Location Terms of implementation ParticipantsAbay project: KazMunayGas (50%), Eni (50%) Zhenis project: KazMunayGas (50%), Lukoil (50%) Al-Farabi project: KazMunayGas (50.01%), Lukoil (49.99%)Current statusgeological exploration work Follow us: Key indicators Total forecasted recoverable resources are about 209 million tons of oil 0 The total […]
View details
Kalamkas-sea and Khazar Fields Joint Development Project
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2022-2028 Status: DONE Kalamkas-sea and Khazar Fields Joint Development Project Location Terms of implementation2022-2028ParticipantsJSC NC «KazMunayGas» (100%). PJSC Lukoil – 50%.Current statusFront-end engineering design (FEED) is in progress. Follow us: Key indicators total predicted recoverable resources, million tons of oil 0 total predicted recoverable resources, billion tons of […]
View details
Turgai Paleozoic
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2021-2027 Status: DONE Turgai Paleozoic LocationKyzylorda regionTerms of implementation2021-2027ParticipantsJSC NC «KazMunayGas» (100%).Current statusStart of exploratory well PZ-1 drilling to a depth of 5500 m is planned. Follow us: Key indicators estimated recoverable resources, million tons 0 investment, billion KZT 0 new jobs during the construction period 0 […]
View details
Rozhkov Development
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2019-2024 Status: DONE Rozhkov Development LocationWest Kazakhstan regionTerms of implementation2019-2024ParticipantsJSC NC «KazMunayGas» – 50%, MOL (FED) Kazakhstan – 27.5%, First International Oil Corporation (FIOC) – 22.5% participation share.Current statusThe field was commissioned in December 2023. Work on further expansion is in progress. Follow us: Key indicators recoverable […]
View details
Oriktau
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2008-2023 Status: DONE Oriktau ocationAktobe regionTerms of implementation2008-2023ParticipantsNC KazMunayGas JSC (100%)Current statusThe field was commissioned in December 2023. Further expansion activities are in progress. Follow us: Key indicators thousand tons of oil and condensate per year 0 investment, billion KZT 0 new jobs during the construction period […]
View details
Kashagan Growth Projects
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2024-20262025-2031 Status: DONE Kashagan Growth Projects LocationAtyrau regionTerms of implementation2024-2026 (Stage 2A), 2025-2031 (Stage 2B).ParticipantsKMG Kashagan B.V. (16.88%), Agip Caspian Sea B.V. (16.81%), ExxonMobil Kazakhstan Inc. (16.81%), Shell Kazakhstan Development B.V. (16.81%), Total E&P Kazakhstan (16.81%), CNPC Kazakhstan B.V. (8.33%), INPEX North Caspian Sea, Ltd. (7.56%)Current statusIn […]
View details
TCO Future Growth Project / Wellhead Pressure Management Project (FGP-WPMP)
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2012-2025 Status: DONE TCO Future Growth Project / Wellhead Pressure Management Project (FGP-WPMP) LocationAtyrau regionTerms of implementation2012-2025ParticipantsTengizchevroil LLP partners – Chevron (50%), ExxonMobil Kazakhstan Ventures Inc (25%), NC KazMunayGas JSC (20%), Lukoil International GmbH (5%)Current statusAs of today, mechanical works are completed. Preparation for operation and pre-commissioning […]
View details
Reconstruction and Expansion of the «Astrakhan-Mangyshlak» Main Waterline – 1st Stage
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2018-2023 Status: DONE Reconstruction and Expansion of the «Astrakhan-Mangyshlak» Main Waterline – 1st Stage LocationAtyrau region, Mangystau regionTerms of implementation2018-2023ParticipantsMain Waterline LLP (wholly owned by KazTransOil JSC)Current statusThe project was completed in 2023. Follow us: Key indicators increase in throughput, thousand cubic meters per day 0 investment, […]
View details
Construction of a New Gas Processing Plant in Zhanaozen
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2021-2024 Status: DONE Construction of a New Gas Processing Plant in Zhanaozen LocationMangystau regionTerms of implementation2021-2024ParticipantsKazGPZ LLP (100%)Current statusAn EPC contractor has been engaged. Plant engineering works are underway. construction-and-assembly works are scheduled to begin in 2025. Follow us: Key indicators associated petroleum and natural gas, mln […]
View details
TAZALYQ
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2019-2023 Status: DONE Construction of a Seawater Desalination Plant in Kenderli LocationАтырауTerms of implementation2019-2023ParticipantsAtyrau Refinery LLP (100%)General ContractorNefteStroyService Ltd LLP and Center-Kotlo-Service LLPCurrent statusconstruction-and-assembly works are in progress Follow us: Key indicators decrease in freshwater intake from the Zhaiyk River, % 0 reduction in wastewater discharge, % […]
View details
Construction of a Seawater Desalination Plant in Kenderli
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: 2021-2024 Status: DONE Construction of a Seawater Desalination Plant in Kenderli LocationMangystau regionTerms of implementation2021-2024ParticipantsJSC NC «KazMunayGas» (100%)General Contractorfor MD: consortium – Metito (UAE) jointly with SMK-Atameken LLP, Caspian HES Consulting LLP, Ak Zhol Kurylys LLP. For ECI: with KMG subsidiaries: KKS (Ken Kurylys Service), MEM (Mangystauenergomunai), […]
View details
KazTransOil Pipeline Optimization
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: Febuary 10, 2022 Status: DONE KazTransOil Pipeline Optimization The KazTransOil Pipeline Optimization project is a collaborative effort between RG GAZ LLP and Kazakhstan’s national oil transportation company, KazTransOil, aimed at enhancing the efficiency and safety of the country’s vast oil pipeline network. This project involves the deployment […]
View details
Mangistau Renewable Energy Initiative
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: March 15, 2023 Status: DONE Mangistau Renewable Energy Initiative In line with RG GAZ LLP’s strategic vision of contributing to a greener future, the Mangistau Renewable Energy Initiative is a landmark project that combines solar and wind energy generation to power local communities and industrial operations. Located […]
View details
West Kazakhstan Pipeline Infrastructure Upgrade
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: April 10,2022 Status: DONE West Kazakhstan Pipeline Infrastructure Upgrade The West Kazakhstan Pipeline Infrastructure Upgrade project is a critical initiative designed to modernize the aging pipeline networks that are vital to Kazakhstan’s petroleum distribution system. RG GAZ LLP is leading this effort, working alongside industry partners to […]
View details
Aktobe Region Seismic Exploration Project
Clients: RP GAZ LLP Url Link: RP GAZ LLP Date: january 09, 2021 Status: DONE Aktobe Region Seismic Exploration Project The Aktobe Region Seismic Exploration Project is one of the most ambitious undertakings of RG GAZ LLP, aimed at unlocking untapped oil and gas reserves in Kazakhstan’s Aktobe region. Leveraging advanced seismic imaging technology, this project involves […]
View details
Coastal Refinery Expansion
Successfully executed the expansion of a major coastal refinery, increasing production capacity by 30%. Our team managed the entire project,
View details
Offshore Gas Platform Installation
Led the installation of an advanced offshore gas platform, providing safe and sustainable energy extraction from deep-sea reserves.
View details
National Fuel Distribution Network
Developed a comprehensive fuel distribution network across multiple regions, optimizing logistics and reducing delivery times by 25%.
View details